01 · Core architecture
PI/Orchestrator, scheduler, fresh worker, deterministic gate, committer, Cognition OS, and the HEAVY authorization boundary.
Open chart →Structured interactive maps based on the current project source and Cognition OS. Each chart is a self-contained HTML document with theme switching, node search, declared-path tracing, and export.
PI/Orchestrator, scheduler, fresh worker, deterministic gate, committer, Cognition OS, and the HEAVY authorization boundary.
Open chart →From seed through R2–R8 to proposal-ready, with kill, park, budget, and stagnation rules kept explicit.
Open chart →The sequence REQUESTED → PI-only GRANTED/DENIED → scheduler → heavy_runner → result ingest.
Open chart →AI briefing, current question, and trust table are read by the pipeline role and written back to insights, experiments, runs, and rejected.
Open chart →State transitions for seed, evidence, developing, feasible, and proposal-ready, including terminal outcomes.
Open chart →R0/R1→R5 in EVOLUTION and R6→R8 in an AO-triggered proposal run.
Open chart →Traceable evolution from prototype cycle-2/cycle-5 to the observation series and the current v3-obs.
Open chart →7 deterministic checks: filesystem, provenance, schema, transition, ledger, heavy_products, match_records. PASS→commit, FAIL→retry/escalate.
Open chart →Core value mechanism: R2 sets the value cap when an idea is born, and later development cannot exceed it. Low-cap ideas should be killed early.
Open chart →Evolution from v1 32GB → v2 3.1MB → v3-obs, including the stagnation period, introduction of HEAVY gating, and the current state.
Open chart →Complete state topology: briefing/question/trust → role → insights/experiments/sessions/rejected/runs/bug_impacts.
Open chart →The complete sequence for PI_DECISIONS.md and HEAVY authorization: the agent may only append lines, while the PI alone owns the verdict.
Open chart →